NAME

EMAIL

COMMENTS/QUESTIONS


Albany: New Providence Nassau, Bahamas

Select another project | View more info on Albany Marina

Albany is a new luxury resort community in The Bahamas that will celebrate the very best in island living. Nestled among 565 oceanfront acres on the island of New Providence, Albany is being developed by Tavistock Group, Tiger Woods and Ernie Els. Scheduled to open in early 2010, Albany will be defined by its setting, architecture, services and amenities designed for the entire family to enjoy. Located just five miles and seven minutes from Nassau’s international airport, Albany is easily accessible with several non-stop flights daily from major U.S. and European cities. With a wide array of activities to please all ages, Albany is destined to be the type of resort community families will visit again and again.

Built to accommodate mega-yachts up to 240 feet, the 71-slip mega-yacht marina will rival the great resort ports of the world. The marina provides complete dock services and hassle-free care including a state-of-the-art floating concrete dock system, high-tech communication systems at each slip and one-touch dialing for access to resort amenities and services.

Petroleum Marine Consultants has been contracted to provide a Design-Build project engineered by our Florida Registered Engineer, with the recommended installation practice based on NFPA 30,30A, NEC,PEI/RP1000 & PEI/RP200-03.

The Marina Fuel facility will consist of one (2) UL-142 double wall 12,000 gallon diesel and one (1) UL-142 double wall split compartment 6000 diesel and 6,000 gasoline.Above storage tanks within an engineered concrete containment area. Off loading of fuel will be accomplished using a Simplex Marine Smart Pump system.

The diesel fuel delivery system will consist of one (1) 3” Innovative Petroleum Products double wall product piping from the two (2) designated diesel fuel tank storage compartments tanks to two (2) High Speed PMC Fuel House dispensers located on Bellingham Unifloat designated fuel dock.

High Speed Diesel dispensing at 75gpm will to be delivered using site specific connections to specific vessels that are equipped to accept fuel at this rate. The additional one (1) diesel dispensers will provide fueling at the rate of 35 gpm with traditional nozzles.
The gasoline fuel delivery system will consist of onshore one (1) 3” IPP reducing to 2” IPP over the water piping. The double wall product piping from the designated gasoline fuel tank to one (1) PMC-510 single product gasoline dispensers located on the upland adjacent to a Bellingham floating dock system.

For more information visit: www.albanybahamas.com

Click images to enlarge

CITY OF HOLLYWOOD FLORIDA
The project was run professionally maintaining a safe environment for ongoing marina operations.

Check out some of our work!
We've installed over 100 marina fueling facilities!
New installation to refit, we can handle any project.

Petroleum Marine Consultants, LLC
13833 Wellington Trace E4 #207
West Palm Beach, FL 33414-9027
Phone: 561-422-9018 | Fax: 561-422-9019
© Petroleum Marine Consultants, LLC . All Rights Reserved.
13833 Wellington Trace E4 #207 • West Palm Beach, FL 33414-9027
Phone: 561-422-9018 | Fax: 561-422-9019 • Email. info@petroleummarine.com
Website design and website hosting by charternet.com