Located in one of the most spectacular fishing locations in the world, Marina Pez Vela in Quepos, Costa Rica is complete with all the amenities and services you’d expect to find in a five-star marina resort, unquestionably the finest and only full service marina you will find in all of Central America. Just one visit to our 55+ acres of land and water at Marina Pez Vela will exceed the expectations of even the most demanding sport fishing, boating and yachting enthusiasts. So, welcome to Costa Rica. If you’ve been before, you know. If you have never been, you will learn. For inside this country is a place you’ll never forget. Marina Pez Vela.
| Under construction are 300 concrete floating dock slips that will accommodate boats up to 200 feet. The marina will have the only full-service repair facility for hundreds of miles complete with 75 and 200-ton Travel-Lifts, unique to all of Central America. Marina Pez Vela will also include a fully staffed maintenance facility capable of any repairs or service required. High speed fuel pumps, dockside pump out station and dockside concierge services also are included in our marina offerings for our boat and yacht owners. |
click images to enlarge
|
- The design and installation of this Marina Fueling System will follow PEI RP1000-09
- Engineered drawings were approved and permitted by MINAE.
click images to enlarge
|
The marina fuel distribution system consists of four (4) 12,000 gallon Eultron UL-142 double wall underground storage tanks with specifically designed overfill and overspill system. The anchoring of the underground storage tank was achieved by the use of dead man concrete anchors, with stainless steel wire rope, stainless steel cable clamps, and stainless steel turnbuckles. Filter Fabric was installed to prevent migration of native soils within the imported 3/8” pea rock backfill. Pearock was used to obtain a stable and self compacting tank installation. |
| The reinforced concrete slab is installed on grade was designed to contain any surface residuals by the use of a perimeter drain plumbed to an oil water separator. The diesel fuel delivery system consists of three (3) 5hp Fe Petro submersible pumps with smart controllers and high speed leak detectors. All diesel tanks are siphoned together to maintain fuel levels during delivery and dispensing of fuel. The gasoline fuel delivery system consists of one (1) 5hp Fe Petro submersible pumps with smart controllers and high speed leak detectors. |
click images to enlarge
|
click images to enlarge
|
Diesel fueling consists of a 4” manifold for the three (3) diesel tanks. Swing check valves were installed in the submersible pumps to allow for the proper flow of fuel. All diesel onshore piping is 4” IPP Petrolpas Fire rated double wall piping reducing to 3” at the onshore/over water transition sump located within 10 ft of the gangway. All gasoline onshore piping is 3” IPP Petrolpas Fire rated double wall piping reducing to 2” at the onshore/over water transition sump located within 10 ft of the gangway. |
| All over the water IPP Petroplas fire rated piping will be installed through Bellingham Marine 6” pvc sleeves located within each floating dock. Over the water 3” diesel piping will supply fuel to four (4) PMC Fuel House dispensers. Two high speed dispensers will be rated for 60- 80gpm and two low speed diesel dispensers will be rated for 35 gpm. Gasoline dispensing will consist of two (2) PMC Fuel House dispensers rated at 25 gpm. |
click images to enlarge
|
All storage tank liquid levels, interstice, piping, dispenser, and transition sumps will be monitored by a Omntec electronic compliance monitoring system with the capability of remote readout. Scribble software will be incorporated by the marina operator for point of sales interface.
|