Palm Harbor Marina, 400 N Flagler Drive West Palm Beach, Florida

Select another project

The magic and excitement of the beautiful Palm Beaches await you when you bring your yacht to the New Palm Harbor Marina. When it reopens in the Fall of 2009, this new state-of-the-art Marina will combine the luxury and exclusivity of Palm Beach with the fun and excitement of City Place and West Palm Beach. Palm Harbor Marina is located in a prime spot along North Flagler Drive, just south of the Flagler Bridge, and only minutes to the Palm Beach Inlet.

The new marina will feature custom-engineered concrete floating docks with extra-wide gangways and finger-piers, color coordinated railing systems, in-slip pump outs, single and three-phase power and much more. Make sure that your plans to stay in Florida include a visit to the new Palm Harbor Marina

Fuel storage is accomplished by the installation of a 20,000 gallon split compartment (5,000 gasoline / 15,000 diesel) Glasteel II underground storage tank. Temporary sheet piling and a wellpoint dewatering was installed during tank excavation due to the high water table with the installations proximity to the intercoastals waterway.

The anchoring of the underground storage tank was achieved by the use of deadman concrete anchors, with stainless steel wire rope, stainless steel cable clamps, and stainless steel turnbuckles. Imported 3/8” pea rock backfill was used to obtain a stable and self compacting tank installation. A 1ft thick reinforced concrete slab is installed on grade.

The High speed diesel delivery system consists of two (2) PMC-Fuel House Dispensers with internal hose reel delivery system. Mega Yachts and Sport fishing boats will be able to fuel at + 60 gpm at one dispenser and 35 gpm at the second dispenser while berthed at concrete fixed dock parallel to the intracostal waterway. Located on the northern section of the fuel dock, gasoline dispensing will consist of one (1) PMC-FH-510 marina dispenser.

The diesel fuel delivery system consists of two (2) 4hp Fe Petro submersible pumps with smart controllers and one (1) 4hp Fe Petro submersible pump for gasoline. Double wall IPP fuel delivery piping +1800 ft of 3″ for diesel and +900 ft of IPP 3” and 900 ft of 2” for gasoline.

All piping, dispenser, and piping sumps will be monitored with the use of an Omntec Compliance monitoring system with the capability of remote. A Dockmaster marina management System will interface with this unit.

Fueling will be controlled by a MPC-8H-25 authorization console installed within the dock masters office. The newest state of the art fuel facility in South Florida, construction within budget, installation performance that beat the clients critical path.

This is only a few reasons that Petroleum Marine Consultants, can say with confidence that they are the leader in this specialized market!

CITY OF HOLLYWOOD FLORIDA
The project was run professionally maintaining a safe environment for ongoing marina operations.

Check out some of our work!
We've installed over 100 marina fueling facilities!
New installation to refit, we can handle any project.

Petroleum Marine Consultants, LLC
13833 Wellington Trace E4 #207
West Palm Beach, FL 33414-9027
Phone: 561-422-9018 | Fax: 561-422-9019
© Petroleum Marine Consultants, LLC . All Rights Reserved.
13833 Wellington Trace E4 #207 • West Palm Beach, FL 33414-9027
Phone: 561-422-9018 | Fax: 561-422-9019 • Email. info@petroleummarine.com
Website design and website hosting by charternet.com